Empowering the Old & the New

From Brownfield to New Construction -
we are here to help at every stage.

Brownfield

In this era of digital transformation, VisualAIM serves to modernize Brownfield facilities quickly and effectively through its intelligization tools.

Process Mapping

Product contamination and spillage result in million dollar losses at manually operated facility.

 

IDP's Process Mapping feature creates a visualization-path map that improves operational awareness across its 280 tanks and dock/rail/truck loading stations.

GLOBAL TERMINAL OPERATOR
TIMELINE: 8 WEEKS
IDP FEATURE: PROCESS MAPPING

Asset Classification

Owner-operator lacks confidence in the accuracy and completeness of its asset inventory across a number of plant-wide applications including EDMS, IDMS, MI, and APM.

 

IDP's Asset Classification feature closes all data gaps by automatically extracting a comprehensive asset register from plant drawings, leading to tens of millions of dollars in reduced risk.

PROPYLENE MANUFACTURER
TIMELINE: 2 WEEKS
IDP FEATURE: ASSET CLASSIFICATION

Drawing Standardization

Inconsistency of as-built P&IDs over 40 years of multiple owners is a major issue.

 

With thousands of man-hour labor-savings, IDP's Drawing Standardization feature automatically re-structures all plant drawings to match the enterprise’s symbols legend- resulting in full operator confidence of all drawings.

PIPELINE AND TERMINAL LLC
TIMELINE: 8 WEEKS
IDP FEATURE: DRAWING STANDARDIZATION

Visualization Layers

Plant personnel have difficulty interpreting complex and data-heavy risk results.

 

Owner-operator uses IDP's Visualization Layers feature to increase reliability through risk visualization on digital P&IDs, reducing interpretation time and increasing confidence in risk program results.

FORTUNE 20 COMPANY
TIMELINE: 2 WEEKS
IDP FEATURE: VISUALIZATION LAYERS

Redlining

Paper P&ID redlines are lost regularly, resulting in poor control over drawing-revision.

 

Using IDP's Redlining feature, all redlining is digitally executed and organized with automated version control that writes changes back to the master CAD file. This ensures documentation compliance and facilitates abnormal situational management procedures.

MAJOR CHEMICAL MANUFACTURER
TIMELINE: 3 WEEKS
IDP FEATURE: REDLINING

Greenfield

Having recognized the trends of new facility construction, VisualAIM's tools provide the necessary functionality to better streamline design, development and delivery of intelligent plants.

EAM Hierarchy

Client significantly behind schedule in getting their EAM solution populated.

 

IDP's EAM Hierarchy feature extracts taxonomically correct asset register directly from P&IDs with a hierarchical structure, saving hundreds of man-hours and eliminating data-entry errors.

MAJOR POLYMER MANUFACTURER
TIMELINE: 2 WEEKS
IDP FEATURE: EAM HIERARCHY